Loading…
Title

Rehabilitation of the drainage infrastructure (syphons nos 1 ...

Description
This item includes the supply of pumps to direct the water from the ... section and profile and transmission to the parks canda ... 349 pages
/349
Full Text
Rehabilitation of the drainageinfrastructure (syphons [email protected], spillways [email protected] 3 and theworkshop ditch), located atthe Chambly CanalTechnical SpecificationsProject Number: CCHM-896Prepared for:Parks Canada AgencyPrepared by:Stantec Consulting Ltd.Stantec Project Number:159100724Issued for tenderJuly 15 th , 2020Sign-off SheetThis document entitled “Rehabilitation of the drainage infrastructure (syphons nos [email protected], weirs [email protected] and the workshop ditch), located at the Chambly Canal” was prepared by Stantec ConsultingLtd. (“Stantec”) for Parks Canada Agency (“the Client”). Any reliance on this document by athird party is strictly prohibited. The material in this document reflects Stantec’s professionaljudgment in light of the scope, schedule and other limitations stated in the document and in thecontract between Stantec and the Client. The opinions expressed in the document are basedon conditions and information existing at the time the document was published and do not takeinto account any subsequ...
Searches Related